How To Create RTM?
Before creating RTM SRS/Sprint backlog documents and test cases documents are required. Below are the steps to create RTM:
- For RTM we will use an Excel sheet.
- Write the name of the project, date, and name of the person who is responsible for RTM.
- Write all requirement IDs row-wise in the first column of an Excel sheet.
- Write all the requirement descriptions row-wise in the second column of an Excel sheet.
- Write all the requirements type row-wise in the third column of an Excel sheet.
- Write all the test cases with their IDs column-wise in an Excel sheet.
- After writing all requirements and test cases you have to verify that for every requirement you have prepared the test cases in both positive and negative flow.
Requirements Traceability Matrix – RTM
Here we will discuss the Requirement Traceability Matrix (RTM). The following 8 topics will be discussed:
Table of Content
- What is Requirement Traceability Matrix (RTM)?
- Why is Requirement Traceability Matrix (RTM) Important?
- Parameters of Requirement Traceability Matrix (RTM):
- Types of Traceability Matrix:
- Who Needs Requirement Traceability Matrix (RTM)?
- Requirement Traceability Matrix (RTM) Template:
Let’s start discussing each of these topics in detail.